2243 Lundy Ave   |   San Jose, CA 95131   |   925-401-2004

Early supplier involvement throughout the design process ensures your NPI builds are flawless

Before the Rev A phase, there is a hardware engineering architectural concept that typically consists of a block diagram. At Optimum, we coined this term as Rev-X. During this phase; it’s best to start a dialog with your suppliers to procure your most important and longest lead time components during the electronic engineering process.

Supply chain risk mitigation with early component procurement throughout the development process.    

Integrated solution to delivering your prototype fabrication and assemblies through early supplier involvement.

Long-term relationships with ISO-certified and ITAR-registered manufacturers with a strong history of quality and on-time delivery.

Project management focused on delivering results and taking away the headache of dealing with a barrage of questions from multiple vendors.

GET IN TOUCH WITH US TO BOOK A PRESENTATION

Learn more about Rev-X Manufacturing in our blog